evaluate relocation requirements for equipment that will BE relocated evaluate the NEW location electrical distribution system for compatibility provide electrical design including permit drawings and title 24 studies. disconnection of the machinery AT the OLD location. Ensuring that ALL requirements for RE installation are MET. prepare NEW location for reinstallation; reconnect. SET UP & test start UP support and verification of equipment operation.
Add a Review